Contact Us
03.04.2026

Engineering-led precast solutions. Cost-efficient by design.
DEMA continues its expansion into European precasting.

We’re proud to announce the delivery of a specialised beam formwork system to Poland — our 44th active country.

This was not standard order delivery Dema, working closely with our client, developed a fully integrated precast production system, engineered to improve cycle times, efficiency, and output quality, drawing upon our experience as a global provider of automation optimized precast concrete substation solutions and applying to precast beam formwork manufacture optimization.

2 x 88.5m beam production lines
Integrated steam curing system across the full length
Insulated formwork casing, directing heat efficiently into the concrete
Full-length hydraulic opening and closing system
Pre-stressed structure, with stressed end and mid plates for prestressed beam production
Adjustable system, producing varying beam lengths and beam heights from 600 mm to 1100 mm
Synchronized adjustable pre-stressing table, aligned with section changes

The result:
Faster production cycles. Optimised energy use. Consistent, high-quality output.

Not just formwork. Engineered solutions and systems to deliver optimized production capability.

Test

Form Gönderimi

Tamam